Heading
Subheading
Drill a 10mm hole for the serrated plug. Pull the sheathed cable through the hole.
Remove the protective film from the 3M tape. Push the serrated plug into the hole
Line up the lamp and press firmly. The lamp is held securely with the plug serrations and high quality 3M tape. Please refer to ADR 13/00 for mounting instructions.
Drill a 10mm hole for the serrated plug. Pull the sheathed cable through the hole.
Remove the protective film from the 3M tape. Push the serrated plug into the hole
Line up the lamp and press firmly. The lamp is held securely with the plug serrations and high quality 3M tape. Please refer to ADR 13/00 for mounting instructions.